Project : Golden Slab of the ESRF synchrotron – EX2 project (particle accelerator)
Mission : Design studies / dimensioning of test slabs.
Evaluation of technical foundation solutions in the pre-project phase, monitoring of the behaviour of the structure during construction and validation of the solutions by on-site measurements. Geometric stability of slabs to thermal variations, concrete shrinkage, dynamic loads applied to slabs. Organisation of data collection programmes and model validation.